[{"data":1,"prerenderedAt":569},["ShallowReactive",2],{"menus-ga-ie":3,"content-ga-ie-projects\u002Fdart-west\u002Fpublic-consultation-round-2\u002Fdart-west-useful-material-and-downloads":130,"sidebar-ga-ie-projects\u002Fdart-west\u002Fpublic-consultation-round-2":542,"breadcrumbs-ga-ie-projects\u002Fdart-west\u002Fpublic-consultation-round-2\u002Fdart-west-useful-material-and-downloads":568},{"mainMenu":4,"footerMenu":97},[5,13,83,90],{"__typename":6,"_system_":7,"slug":9,"label":10,"subpages":11},"Navigation",{"id":8},"96b47639-528b-59ae-9848-46941e3edef8","about-dart","Eolas Faoin DART+",{"items":12},[],{"__typename":6,"_system_":14,"slug":16,"label":17,"subpages":18},{"id":15},"2fb01086-4219-5dcf-af85-9d5194fd2c01","projects","Tionscadail",{"items":19},[20,32,42,52,62,72],{"__typename":6,"_system_":21,"label":23,"slug":24,"link":25},{"id":22},"2dc307f6-8625-5782-86c5-dbd919775eaf","DART+ an Iarthair","dart-west",{"externalUrl":26,"linkedItem":27,"label":23,"newWindow":30},"",{"__typename":28,"slug":29},"Page","projects\u002Fdart-west",{"items":31},[],{"__typename":6,"_system_":33,"label":35,"slug":36,"link":37},{"id":34},"610e99ac-1635-573d-9d0e-8965a85bcd5c","DART+ An tIardheisceart","dart-south-west",{"externalUrl":26,"linkedItem":38,"label":35,"newWindow":40},{"__typename":28,"slug":39},"projects\u002Fdart-south-west",{"items":41},[],{"__typename":6,"_system_":43,"label":45,"slug":46,"link":47},{"id":44},"c487e302-d504-5717-9bf3-9da9d5800f6d","DART+ Cósta Thuaidh","dart-coastal-north",{"externalUrl":26,"linkedItem":48,"label":45,"newWindow":50},{"__typename":28,"slug":49},"projects\u002Fdart-north",{"items":51},[],{"__typename":6,"_system_":53,"label":55,"slug":56,"link":57},{"id":54},"040d121a-6ec9-5b79-af88-ccb58c778ec1","DART+ Cósta Theas","dart-coastal-south",{"externalUrl":26,"linkedItem":58,"label":55,"newWindow":60},{"__typename":28,"slug":59},"projects\u002Fdart-coastal-south",{"items":61},[],{"__typename":6,"_system_":63,"label":65,"slug":66,"link":67},{"id":64},"89db318a-cb74-5191-95da-4dd4b39246a6","Flít DART+","dart-fleet",{"externalUrl":26,"linkedItem":68,"label":65,"newWindow":70},{"__typename":28,"slug":69},"projects\u002Fdart-fleet",{"items":71},[],{"__typename":6,"_system_":73,"label":75,"slug":76,"link":77},{"id":74},"24880e0d-427e-48a7-a396-decc3dc94998","DART+ Depot","dart-depot",{"externalUrl":78,"linkedItem":79,"label":75,"newWindow":81},"\u002Fga-ie\u002Fprojects\u002Fdart-depot",{"__typename":28,"slug":80},"projects\u002Fdart-depot",{"items":82},[],{"__typename":6,"_system_":84,"slug":86,"label":87,"subpages":88},{"id":85},"aa5e6b7c-1089-55dc-89bb-6975b60a4370","news","Nuacht",{"items":89},[],{"__typename":6,"_system_":91,"slug":93,"label":94,"subpages":95},{"id":92},"141b0d1c-fab1-51f9-97da-bfbd824f3da3","faqs","Ceisteanna Coitianta",{"items":96},[],[98,109,120],{"__typename":6,"_system_":99,"slug":101,"label":102,"link":103,"subpages":107},{"id":100},"97f864fb-0841-5063-9eae-181190f04045","contact-us","Déan teagmháil linn",{"externalUrl":26,"linkedItem":104,"label":102,"newWindow":105},{"__typename":28,"slug":101},{"items":106},[],{"items":108},[],{"__typename":6,"_system_":110,"slug":112,"label":113,"link":114,"subpages":118},{"id":111},"ec744e0a-3631-5b05-ae79-3ac80102ad8c","terms-privacy-cookies","Téarmaí Úsáide, Ráiteas Príobháideachais agus Beartas maidir le Fianáin",{"externalUrl":26,"linkedItem":115,"label":113,"newWindow":116},null,{"items":117},[],{"items":119},[],{"__typename":6,"_system_":121,"slug":123,"label":124,"link":125,"subpages":128},{"id":122},"00aa43f1-8c51-53ea-957d-d4132b9509a6","accessibility","Inrochtaineacht",{"externalUrl":26,"linkedItem":115,"label":124,"newWindow":126},{"items":127},[],{"items":129},[],{"_document":131,"_seoSnippet":529,"_system_":530,"slug":532,"showSideMenu":533,"showBreadcrums":538},{"body":132,"title":528,"description":26},{"html":133,"components":134,"linkedItems":526},"\u003Cobject type=\"application\u002Fkenticocloud\" data-type=\"item\" data-rel=\"component\" data-codename=\"n5b0bac25_3c7c_01d1_18f7_6c63ef090d07\">\u003C\u002Fobject>",{"items":135},[136],{"__typename":137,"_system_":138,"title":141,"subtitle":26,"cta":115,"listType":142,"items":147},"List",{"id":139,"codename":140},"5b0bac25-3c7c-01d1-18f7-6c63ef090d07","n5b0bac25_3c7c_01d1_18f7_6c63ef090d07","Useful Resources & Downloads",{"items":143},[144],{"_system_":145},{"codename":146},"resources",{"items":148,"totalCount":525},[149,163,175,187,199,436],{"__typename":150,"title":151,"description":152,"date":153,"file":154,"thumbnail":159},"Resource","Bileog Eolais (940KB)","Comhairliúchán poiblí ann rogha is dealraithí a roghnófar.","2020-08-17T18:30:00Z",{"items":155},[156],{"url":157,"name":158,"description":115},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002F691c775f-5168-46f6-8f6d-969359093cd7\u002F22a2015b-7da6-4331-959a-a71d4992ed9c.pdf","22a2015b-7da6-4331-959a-a71d4992ed9c.pdf",{"items":160},[161],{"url":162},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002Fd53f7724-c1f2-497b-8405-99e0374ffc45\u002Ff4eda71f-85c5-486b-9184-5360dfb57dae.jpg",{"__typename":150,"title":164,"description":165,"date":153,"file":166,"thumbnail":171},"Bróisiúr Líne DART+ an Iarthair (23MB)","Bróisiúr comhairliúchán poiblí ann rogha is dealraithí a roghnófar.",{"items":167},[168],{"url":169,"name":170,"description":115},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002F22e3e10b-ea8b-4cd0-8372-361b8c185437\u002F025bd2d3-6051-4b52-995a-4e70fb724385.pdf","025bd2d3-6051-4b52-995a-4e70fb724385.pdf",{"items":172},[173],{"url":174},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002F8d894d1e-5a4d-4938-8ae8-0f3e4396a6d5\u002F49fb30b3-4722-4846-991a-ad51871edc68.jpg",{"__typename":150,"title":176,"description":177,"date":153,"file":178,"thumbnail":183},"Tuarascáil ar Roghnú na Réamhroghanna: Achoimre Feidhmiúcháin (28MB)","Tuarascáil ar Roghnú na Réamhroghanna: Achoimre Feidhmiúcháin",{"items":179},[180],{"url":181,"name":182,"description":115},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002F126fce39-ee41-4f71-9ede-9cee8851bb64\u002Fa301832d-bf90-4ce5-992e-f4f1b520412d.pdf","a301832d-bf90-4ce5-992e-f4f1b520412d.pdf",{"items":184},[185],{"url":186},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002F48752929-9c3a-4243-8858-4c89ae76fb8d\u002F8a722b1c-ed4e-43d9-a2df-968285520964.JPG",{"__typename":150,"title":188,"description":189,"date":153,"file":190,"thumbnail":195},"Tuarascáil ar Roghnú na Réamhroghanna: Príomhthurascáil (13.5MB)","Tuarascáil ar Roghnú na Réamhroghanna: Príomhthurascáil",{"items":191},[192],{"url":193,"name":194,"description":115},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002F39777a70-0daa-4146-b062-432b99a3da7a\u002Ff5cb866d-5625-429a-88b3-79dfb9c4ff0c.pdf","f5cb866d-5625-429a-88b3-79dfb9c4ff0c.pdf",{"items":196},[197],{"url":198},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002F20f71da1-219b-4bf5-b68b-12da33cfef0f\u002Fc36d15b8-a045-4b4d-8bf3-8d566076d871.jpg",{"__typename":137,"_system_":200,"title":202,"subtitle":203,"cta":115,"items":204},{"codename":201},"n_32d31cdc_6c5a_478f_a934_4798becb0522_res_list_23","Preliminary Options Selection Report: Annexes","Public Consultation No. 1 Preliminary Options Selection Report: Supporting Reports for the DART+ West Project",{"items":205,"totalCount":435},[206,219,232,244,256,267,278,289,302,315,328,341,352,363,374,387,400,411,422],{"__typename":150,"title":207,"description":208,"date":209,"file":210,"thumbnail":215},"Annex 1.1 Emerging Preferred Option Figures (25.3MB)","DART+ West Preliminary Options Selection Report Annex 1.1 with maps of the proposed emerging preferred route options","2021-02-21T18:30:00Z",{"items":211},[212],{"url":213,"name":214,"description":115},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002F0f9e2634-e133-4d10-9fd8-869800f099b3\u002F42a5eec2-3fcf-4251-aba8-5ff261a89eb0.pdf","42a5eec2-3fcf-4251-aba8-5ff261a89eb0.pdf",{"items":216},[217],{"url":218},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002Fd5cda6d3-5999-4075-a052-affc89135102\u002Fresource-fallback-thumbnail.png",{"__typename":150,"title":220,"description":221,"date":222,"file":223,"thumbnail":228},"Annex 3.1 Maynooth Line Transport Study Draft Final Report (16.4MB)","DART+ West Preliminary Options Selection Report Annex 3.1 Maynooth Line Transport Study Draft Final Report: July 2019:  by Systra \u002F CSEA for Iarnród Éireann and the National Transport Authority.","2019-07-07T18:30:00Z",{"items":224},[225],{"url":226,"name":227,"description":115},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002F33743439-e176-42fb-9fab-98c7126d0aca\u002Fb3d81daa-ad47-43fd-8a75-87cc75629b73.pdf","b3d81daa-ad47-43fd-8a75-87cc75629b73.pdf",{"items":229},[230],{"url":231},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002Fde763812-f4cd-4ef0-bfd2-6fe163a4fc18\u002F82d58fa0-a584-4a09-ac08-7542af09c5cc.jpg",{"__typename":150,"title":233,"description":234,"date":235,"file":236,"thumbnail":241},"Annex 3.2 DART Expansion Programme Options Assessment – Addendum Report (2MB)","DART+ West Preliminary Options Selection Report Annex 3.2 DART Expansion Programme Options Assessment – Addendum Report; August 2018; by Systra \u002F Jacobs for Iarnród Éireann and the NTA","2018-08-20T18:30:00Z",{"items":237},[238],{"url":239,"name":240,"description":115},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002Ff2987bfd-d8ba-4f10-82c5-66160924e544\u002Ff3822c3c-19a1-4786-afce-2b74ae335756.pdf","f3822c3c-19a1-4786-afce-2b74ae335756.pdf",{"items":242},[243],{"url":218},{"__typename":150,"title":245,"description":246,"date":153,"file":247,"thumbnail":252},"Annex 3.3 DART Expansion Programme Options Assessment (27MB)","DART+ West Preliminary Options Selection Report Annex 3.3 DART Expansion Programme Options Assessment; by Systra \u002F Jacobs for IE and the NTA;",{"items":248},[249],{"url":250,"name":251,"description":115},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002F4a29e038-c404-497b-92f2-b18ec0b1bb00\u002Fcdfdcf84-dc0b-4fd0-89ca-3f22213ba258.pdf","cdfdcf84-dc0b-4fd0-89ca-3f22213ba258.pdf",{"items":253},[254],{"url":255},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002F6cf1af4b-212a-457a-959e-0e462b40c512\u002F3bf244a6-4d56-4998-bd92-1c7883ce6847.jpg",{"__typename":150,"title":257,"description":258,"date":153,"file":259,"thumbnail":264},"Annex 3.4A Appendix A Peak Hour Service Plans (48KB)","DART+ West Preliminary Options Selection Report Annex 3.4A Appendix A Peak Hour Service Plans",{"items":260},[261],{"url":262,"name":263,"description":115},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002Fc5cfe09b-bb1c-47a3-a99e-a938c8934f24\u002F76e73933-028b-41a3-963a-3d35eb0ad42d.pdf","76e73933-028b-41a3-963a-3d35eb0ad42d.pdf",{"items":265},[266],{"url":218},{"__typename":150,"title":268,"description":269,"date":153,"file":270,"thumbnail":275},"Annex 3.4B Appendix B Boardings by Mode (219KB)","DART+ West Preliminary Options Selection Report Annex 3.4B Appendix B Boardings by Mode",{"items":271},[272],{"url":273,"name":274,"description":115},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002F74b7e020-0308-4b02-a067-9922917b0e7b\u002Fa366676a-9e23-48bd-9fd5-1b2bc4f3d077.pdf","a366676a-9e23-48bd-9fd5-1b2bc4f3d077.pdf",{"items":276},[277],{"url":218},{"__typename":150,"title":279,"description":280,"date":153,"file":281,"thumbnail":286},"Annex 3.4C Appendix C Passenger Loading Profiles by Line (814KB)","DART+ West Preliminary Options Selection Report Annex 3.4C Appendix C Passenger Loading Profiles by Line",{"items":282},[283],{"url":284,"name":285,"description":115},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002Fccccfe48-0eb8-4def-9d8c-bde4d6d8569c\u002Fc3504682-0f35-4fce-ac25-33f98d1b323d.pdf","c3504682-0f35-4fce-ac25-33f98d1b323d.pdf",{"items":287},[288],{"url":218},{"__typename":150,"title":290,"description":291,"date":292,"file":293,"thumbnail":298},"Annex 3.4 NTA DART Expansion Programme (4.6MB)","DART+ West Preliminary Options Selection Report Annex 3.4 NTA DART Expansion Programme Future Patronage Modelling; by Systra \u002F Jacobs for the NTA.","2020-06-09T18:30:00Z",{"items":294},[295],{"url":296,"name":297,"description":115},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002Fdef4c5fe-ae26-49d9-a1f3-333dd1047006\u002Ffb2b9af8-8f14-4f69-992d-91e23c590b9c.pdf","fb2b9af8-8f14-4f69-992d-91e23c590b9c.pdf",{"items":299},[300],{"url":301},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002F90b3843b-52a1-450b-920a-9dc64f2be695\u002Ff8db83be-4d3f-429e-9046-a2e471771f8f.jpg",{"__typename":150,"title":303,"description":304,"date":305,"file":306,"thumbnail":311},"Annex 4.1A EMU Depot Location Feasibility Study Report (1.6MB)","DART+ West Preliminary Options Selection Report Annex 4.1A EMU Depot Location Feasibility Study Report","2010-01-31T18:30:00Z",{"items":307},[308],{"url":309,"name":310,"description":115},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002Fc90b8894-49e2-41b3-b6f2-5e9c203d1cb6\u002Fe13f0b72-734b-45de-8d0c-3d3322214146.pdf","e13f0b72-734b-45de-8d0c-3d3322214146.pdf",{"items":312},[313],{"url":314},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002F13c05f35-c692-450e-a87d-2b5912e04c10\u002F66df991e-c4fb-4c8c-ae91-176ff03de38c.jpg",{"__typename":150,"title":316,"description":317,"date":318,"file":319,"thumbnail":324},"Annex 4.1B Depot Location Assessment (3.1MB)","DART+ West Preliminary Options Selection Report Annex 4.1B Centre of Excellence DART Expansion Maintenance Depot Site Location Assessment","2019-10-10T18:30:00Z",{"items":320},[321],{"url":322,"name":323,"description":115},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002F0080564a-2c5a-4a20-a662-f8946558b3dc\u002F2414d8ec-bdd8-4591-8fd8-599b0ad210dd.pdf","2414d8ec-bdd8-4591-8fd8-599b0ad210dd.pdf",{"items":325},[326],{"url":327},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002F3937fec8-ddc9-4c58-ba59-c48256c9d97d\u002F66861115-3fec-45ad-b0c8-a70551fb6dc2.jpg",{"__typename":150,"title":329,"description":330,"date":331,"file":332,"thumbnail":337},"Annex 4.3A Connolly Station Enhancement Options Study (802KB)","DART+ West Preliminary Options Selection Report Annex 4.3A Connolly Station Enhancement Options Study – Options Selection Report. By Jacobs for the NTA","2019-03-25T18:30:00Z",{"items":333},[334],{"url":335,"name":336,"description":115},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002F797bcdb5-407e-4239-bcc7-af7983fe26ed\u002Fc469ac50-c420-434f-a5b3-2326b3aa1d87.pdf","c469ac50-c420-434f-a5b3-2326b3aa1d87.pdf",{"items":338},[339],{"url":340},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002F11be2a2a-430d-4047-a043-c3ae3b9007d1\u002F1501b572-9880-4fd5-aa3d-8228a6c530a5.jpg",{"__typename":150,"title":342,"description":343,"date":153,"file":344,"thumbnail":349},"Annex 4.3A Appendix A. Permanent Way Drawings (7MB)","DART+ West Preliminary Options Selection Report Annex 4.3A Appendix A. Permanent Way Drawings",{"items":345},[346],{"url":347,"name":348,"description":115},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002F73c558f8-1225-4c58-9ed3-99ec985db946\u002F3268d0eb-6a46-442b-b3dc-43f98885feeb.pdf","3268d0eb-6a46-442b-b3dc-43f98885feeb.pdf",{"items":350},[351],{"url":218},{"__typename":150,"title":353,"description":354,"date":153,"file":355,"thumbnail":360},"Annex 4.3A Appendix B. Civil Engineering Drawings (2.3MB)","DART+ West Preliminary Options Selection Report Annex 4.3A Appendix B. Civil Engineering Drawings",{"items":356},[357],{"url":358,"name":359,"description":115},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002F40239b11-5066-4042-af82-f29183c10c8e\u002F58fc0dd0-a432-43e6-94fc-5065384335d1.pdf","58fc0dd0-a432-43e6-94fc-5065384335d1.pdf",{"items":361},[362],{"url":218},{"__typename":150,"title":364,"description":365,"date":153,"file":366,"thumbnail":371},"Annex 4 3Ac Appendix C. Passenger Demand Assessment Report (66MB)","DART+ West Preliminary Options Selection Report Annex 4 3Ac Appendix C. Passenger Demand Assessment Report",{"items":367},[368],{"url":369,"name":370,"description":115},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002F2764d092-f02c-4a3b-a3fd-d59da753d3d9\u002F82fca4ee-ff22-4136-bf4c-cf8a486a340a.pdf","82fca4ee-ff22-4136-bf4c-cf8a486a340a.pdf",{"items":372},[373],{"url":218},{"__typename":150,"title":375,"description":376,"date":377,"file":378,"thumbnail":383},"Annex 4.3B Connolly Station Enhancement Options Study (3.2MB)","DART+ West Preliminary Options Selection Report Annex 4.3B Connolly Station Enhancement Options Study – Staged Approach for Infrastructure – Technical Note. By Jacobs for the NTA","2019-08-25T18:30:00Z",{"items":379},[380],{"url":381,"name":382,"description":115},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002Fd0110935-5304-4221-895a-aa6845b83ffe\u002Ffe19bdbf-c867-44e7-983d-7fe0032f8aa9.pdf","fe19bdbf-c867-44e7-983d-7fe0032f8aa9.pdf",{"items":384},[385],{"url":386},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002F8be4e520-4e96-43d8-b021-e46f81e46eee\u002F6270a7c9-b053-416c-bc7e-fbae37a032b3.jpg",{"__typename":150,"title":388,"description":389,"date":390,"file":391,"thumbnail":396},"Annex 4.4A DART+ Programme Docklands Station Options Study (48MB)","DART+ West Preliminary Options Selection Report Annex 4.4A DART+ Programme Docklands Station Options Study Summary Report","2020-08-04T18:30:00Z",{"items":392},[393],{"url":394,"name":395,"description":115},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002F5f60438b-88b8-4c3e-9123-1ca7d655c37c\u002F66365eea-6847-4478-b498-d6ac58527a0c.pdf","66365eea-6847-4478-b498-d6ac58527a0c.pdf",{"items":397},[398],{"url":399},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002Feed968ba-ceb0-4d0d-815a-d226dc9f1fb0\u002Fc7ef42c6-6300-4a10-b43e-824774bf0cf2.jpg",{"__typename":150,"title":401,"description":402,"date":153,"file":403,"thumbnail":408},"Annex 9.3A Stage 1 MCA Level Crossing matrices (92.7MB)","DART+ West Preliminary Options Selection Report Annex 9.3A Stage 1 MCA Level Crossing matrices",{"items":404},[405],{"url":406,"name":407,"description":115},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002F7cb6b9fb-c157-4a38-bc78-12e34cfed8db\u002F33a6c12d-c3e3-4d43-b59e-12b8fc483376.pdf","33a6c12d-c3e3-4d43-b59e-12b8fc483376.pdf",{"items":409},[410],{"url":218},{"__typename":150,"title":412,"description":413,"date":153,"file":414,"thumbnail":419},"Annex 9.3B Stage 2 MCA Level Crossing matrices (743KB)","DART+ West Preliminary Options Selection Report Annex 9.3B Stage 2 MCA Level Crossing matrices",{"items":415},[416],{"url":417,"name":418,"description":115},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002Fe8aef2e3-c2f5-47ff-b5fe-ba31b1d30818\u002Fb2c4654a-92dd-482c-ae54-c9cef9a83052.pdf","b2c4654a-92dd-482c-ae54-c9cef9a83052.pdf",{"items":420},[421],{"url":218},{"__typename":150,"title":423,"description":424,"date":425,"file":426,"thumbnail":431},"Annex 11 Depot Options Selection Report (11.7MB)","DART+ West Preliminary Options Selection Report Annex 11 Depot Options Selection Report. By IDOM Consulting, Engineering, Architecture for Iarnród Éireann","2020-06-21T18:30:00Z",{"items":427},[428],{"url":429,"name":430,"description":115},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002F98b6d041-a976-45d2-85bd-49611307ead1\u002Fa3aa8bf9-8067-406d-87e0-af799f0bab57.pdf","a3aa8bf9-8067-406d-87e0-af799f0bab57.pdf",{"items":432},[433],{"url":434},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002F301f0d12-c7c8-401d-a652-9e7608747132\u002F0835a0a4-b261-4a4e-987b-f71ba6ba1e96.jpg",19,{"__typename":137,"_system_":437,"title":439,"subtitle":440,"cta":115,"items":441},{"codename":438},"n_32d31cdc_6c5a_478f_a934_4798becb0522_res_list_31","Preliminary Options Selection Report: Drawings","Public Consultation No. 1 Preliminary Options Selection Report: Supporting Drawings for the DART+ West Project",{"items":442,"totalCount":524},[443,455,467,478,490,502,513],{"__typename":150,"title":444,"description":445,"date":446,"file":447,"thumbnail":452},"Utilities Drawings","DART+ West Preliminary Options Selection Report - Volume 2: Drawings - Utilities Drawings","2020-08-20T18:30:00Z",{"items":448},[449],{"url":450,"name":451,"description":115},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002Fe99a770f-e211-42cd-9ee1-fe2a52db261b\u002F3fa61c52-ca94-463f-9b74-7c7605230e91.pdf","3fa61c52-ca94-463f-9b74-7c7605230e91.pdf",{"items":453},[454],{"url":218},{"__typename":150,"title":456,"description":457,"date":458,"file":459,"thumbnail":464},"Level Crossing Options Drawings (42MB)","DART+ West Preliminary Options Selection Report - Volume 2: Drawings - Level Crossing Options Drawings","2020-06-02T18:30:00Z",{"items":460},[461],{"url":462,"name":463,"description":115},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002F8fdbd640-c96e-42ff-b492-680a5b1bae2c\u002Fb2e56de1-5e52-4c02-856d-500222f1e859.pdf","b2e56de1-5e52-4c02-856d-500222f1e859.pdf",{"items":465},[466],{"url":218},{"__typename":150,"title":468,"description":469,"date":458,"file":470,"thumbnail":475},"Index Cover Sheet for Level Crossing Options Drawings (330KB)","DART+ West Preliminary Options Selection Report - Volume 2: Drawings - Index Cover Sheet for Level Crossing Options Drawings",{"items":471},[472],{"url":473,"name":474,"description":115},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002F8d37adba-d61a-4c46-b8a0-030420d9c307\u002F7dfa1694-6b1b-4cdd-b3eb-f8f3491e4b07.pdf","7dfa1694-6b1b-4cdd-b3eb-f8f3491e4b07.pdf",{"items":476},[477],{"url":218},{"__typename":150,"title":479,"description":480,"date":481,"file":482,"thumbnail":487},"Land Use Drawings (32MB)","DART+ West Preliminary Options Selection Report - Volume 2: Drawings - Land Use Drawings","2020-08-19T18:30:00Z",{"items":483},[484],{"url":485,"name":486,"description":115},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002Fae66d6a6-1853-484c-85e3-3007c81e22ef\u002Fcd668b83-67f5-429f-96f8-c6272b5c9be1.pdf","cd668b83-67f5-429f-96f8-c6272b5c9be1.pdf",{"items":488},[489],{"url":218},{"__typename":150,"title":491,"description":492,"date":493,"file":494,"thumbnail":499},"Environmental (General) Drawings (46MB)","DART+ West Preliminary Options Selection Report - Volume 2: Drawings - Environmental (General) Drawings","2020-06-19T18:30:00Z",{"items":495},[496],{"url":497,"name":498,"description":115},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002F82873d6d-7d86-4ee0-b231-81cc4a765977\u002F2e6dbc99-30ca-4ff4-aa61-c8de47462176.pdf","2e6dbc99-30ca-4ff4-aa61-c8de47462176.pdf",{"items":500},[501],{"url":218},{"__typename":150,"title":503,"description":504,"date":481,"file":505,"thumbnail":510},"Depot Drawings (34MB)","DART+ West Preliminary Options Selection Report - Volume 2: Drawings - Depot Drawings",{"items":506},[507],{"url":508,"name":509,"description":115},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002F7016dcd0-7b34-4327-90aa-cda7e2463b91\u002F645373fb-56ef-4788-bf3e-4ce47eac79ac.pdf","645373fb-56ef-4788-bf3e-4ce47eac79ac.pdf",{"items":511},[512],{"url":218},{"__typename":150,"title":514,"description":515,"date":481,"file":516,"thumbnail":521},"Cultural Heritage Drawings (35MB)","DART+ West Preliminary Options Selection Report - Volume 2: Drawings - Cultural Heritage",{"items":517},[518],{"url":519,"name":520,"description":115},"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002Fa439a0e7-eaa3-0154-d646-f6520be9179b\u002Fc3dc42e4-5a7a-411c-bf79-fbb946c0aad6\u002Fbf079a3b-a556-4500-955c-82e5fcb9daf4.pdf","bf079a3b-a556-4500-955c-82e5fcb9daf4.pdf",{"items":522},[523],{"url":218},7,6,{"items":527},[],"Acmhainní agus Earraí Áisiúla le hÍoslódáil No.1",{"metaTitle":528,"metaDescription":26,"searchIndexPriority":115,"urlAlias":26},{"id":531},"547603b9-5a87-57ff-9a35-2c52a49dc419","projects\u002Fdart-west\u002Fpublic-consultation-round-2\u002Fdart-west-useful-material-and-downloads",{"items":534},[535],{"_system_":536},{"codename":537},"yes",{"items":539},[540],{"_system_":541},{"codename":537},{"title":543,"subpages":544},"Babhta Comhairliúcháin Phoiblí 2",[545,549,552,555,558,561,564,567],{"slug":546,"title":547,"type":548},"projects\u002Fdart-west\u002Fpublic-consultation-round-2\u002Fkey-infrastructural-elements","Príomhghnéithe Bonneagracha","page",{"slug":550,"title":551,"type":548},"projects\u002Fdart-west\u002Fpublic-consultation-round-2\u002Fdart-west-route-map","Léarscáil de Bhealach DART+ an Iarthair",{"slug":553,"title":554,"type":548},"projects\u002Fdart-west\u002Fpublic-consultation-round-2\u002Fdart-west-public-consultation-process","Próiséas Comhairliúcháin Phoiblí DART+ an Iarthair",{"slug":556,"title":557,"type":548},"projects\u002Fdart-west\u002Fpublic-consultation-round-2\u002Fbenefits-of-dart-west","Buntáistí Líne DART+ an Iarthair",{"slug":559,"title":560,"type":548},"projects\u002Fdart-west\u002Fpublic-consultation-round-2\u002Fdart-west-next-steps","Na Chéad Chéimeanna Eile",{"slug":562,"title":563,"type":548},"projects\u002Fdart-west\u002Fpublic-consultation-round-2\u002Fhow-to-engage-contact-us","Conas Dul i nGníomh \u002F i dTeagmháil Linn",{"slug":565,"title":566,"type":548},"projects\u002Fdart-west\u002Fpublic-consultation-round-2\u002Fuseful-materials-and-downloads","DART+ an Iarthair Comhairliúchán Phoiblí No.2 Acmhainní agus Earraí Áisiúla le hÍoslódáil",{"slug":532,"title":528,"type":548},{"projects\u002Fdart-west\u002Fpublic-consultation-round-2\u002Fdart-west-useful-material-and-downloads":528,"projects\u002Fdart-west":23,"projects":17,"projects\u002Fdart-west\u002Fpublic-consultation-round-2":543},1787734542398]